Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Aug 09, 2023     Deburring H-stab ribs - (1.0 hour)       Category: Tail Feathers
I had some time to get back on the project, so I started by beginning some of the preparation of the ribs that will go in the Horizontal Stabilizer. The edges of all of these parts are still sharp from the factory punching process, so I used the Scotch-Brite wheel on the bench grinder to smooth the outer flat edges. All interior lightening holes were deburred with the hand deburring tool and then smoothed over with a Scotch-Brite pad. Then I used the bench grinder again to contour the leading edge facets of the nose ribs to prevent protrusions through the skin later.

What's next? Dry fitting, match driling of these ribs, and probably some priming.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.